Project Description

Replacement of existing structure carrying Tower Road over Funk Run with an 18′ x 10′ Precast Concrete Box Culvert including roadway reconstruction, resurfacing, drainage, and other miscellaneous construction

  • 700 CY Class 3 Excavation, 300 CY in Rock
  • 45 LF 30″ Diameter Drilled Rock Socket Caissons
  • 115 LF Steel Beam Soldier Piles
  • 365 SF Precast Concrete Lagging

Project Details

  • Contract Value: $787,000

  • Location: Lawrence Co., PA

  • Capabilities Highlighted:
    -Heavy Civil/Highway

    -Drilled & Driven Foundations/Shoring & Piling Solutions