Project Description

This project is for the removal and replacement of two existing structures on SR 160 in Cambria County. The existing 2 Span Steel Rolled Beam Bridge which carries SR 160 over the Little Conemaugh River replaced with a 2-Span Continuous Prestressed Concrete PA Bulb-Tee Beam Bridge. The existing CMP Arch which carries SR 160 over Settlemyers Run replaced with a Single Cell 14’-0” x 10’-0” Precast Concrete Box Culvert

  • Bridge Structure
    • 4,000 CY Class III Excavation
    • 730 CY Class A Concrete
    • 230 CY Class AA Concrete
    • 165 CY Class AAAP Concrete
    • 12 Prestressed Concrete Bulb Tee Beams 60′ and 80′ in lengths
    • 146,000 Lbs. Reinforcement Bars

Project Details

  • Contract Value: $4,572,000

  • Location: Summerhill Township, Wilmore Borough, Cambria Co., PA

  • Capabilities Highlighted:
    -Heavy Civil/Highway
    -Drilled & Driven Foundations/Shoring & Piling Solutions