Project Description

Project Description

Demolition of existing bridge and construction of new three span bridge carrying SR 403 over the Conemaugh River.  Installation of temporary shoring and arch culvert along Maple Avenue.

  • 13,500 CY excavation of residual/hazardous soil and disposal
  • 3,000 SY concrete paving
  • 4,700 SY bituminous paving
  • 360 LF BEBO arch culvert
  • 2,600 CY cast-in-place concrete
  • 415,000 LB reinforcement bars
  • 431,000 LB fabricated structural steel
  • 200 LF steel bearing piles

Project Details

  • Contract Value: $10.2 million

  • Location: Johnstown, PA, Cambria County

  • Capabilities Highlighted: Heavy Civil/Highway