Project Description

Construct cast in place tank to recirculate Acid Mine Drainage Water back through treatment facility. HDPE Fusion pipe, manholes, flumes, and associated electronic controls, grates and fencing for new tank.

  • Erosion and Sediment Controls
  • Relocate Municipal Sanitary Sewer
  • Cast-in-Place Concrete Tank Structure
  • Diversion Manholes
  • Sluice, Check, and Manual Gate Valves
  • 1,455 LF 30” HDPE Pipe
  • 1,400 LF 6” HDPE Pipe
  • 3,000 LF Fiber Optic Cable and Conduit for Process Controls
  • 1,000 SF Gravel Access Roads
  • Building Foundation and Slab for Master Control Unit
  • Pre-Fabricated Structure for Master Control Unit
  • Master Control Unit and Pump Control Panel Installation
  • Submersible Pumps Installation

Project Details

  • Contract Value: $1 million

  • Location: Tire Hill, Pa, Somerset County

  • Capabilities Highlighted:
    -Industrial/Mining