Project Description

Replacement of the existing bridge structure with a 14’ x 8’ precast concrete box culvert on SR 119 over Zellers Run. Reconstruction of the approach roadway, temporary bypass pumping of stream, associated traffic control, and other miscellaneous construction.

  • Three Phase Project on SR 119 with 6 Lanes of Traffic Including two turning lanes on North and South Ends of Project Limits
  • Installed 13 Precast Concrete Box Culvert sections totaling 87 LF
  • Cast-in-Place Outlet Floor and Wing Sections 9’ x 14’ around existing utilities
  • 1291 CY Class I Excavation
  • 1008 CY Class III Excavation
  • 7557 SY Bituminous Asphalt Paving
  • 798 LF Concrete Curb
  • 5511 LB Reinforcement Bars
  • 918 CY Selected Borrow Aggregate
  • 1010 LF Trenching and Backfill
  • Temporary Excavation Support and Protection System
  • Temporary Bypass Pumping of Sanitary Sewer
  • Sanitary Sewer Relocation
  • 239 LF Ductile Iron Sewer Pipe with 53LF of Concrete Encasement
  • Installation of 12’ x 8’ x 12’ Precast Concrete Sewer Vault, under SR 30 Overpass, with a Base, Riser, and Lid Total Weight of 79,133 LBS

Project Details

  • Contract Value: $2.2 million

  • Location: Westmoreland Co., PA

  • Capabilities Highlighted:
    -Heavy Civil/Highway
    -Drilled-Driven Foundations-Shoring and Piling Solutions