Project Description

Demolition of existing bridge and construction of new three span bridge carrying SR 403 over the Conemaugh River.  Installation of temporary shoring and arch culvert along Maple Avenue.

  • 13,500 CY excavation of residual/hazardous soil and disposal
  • 3,000 SY concrete paving
  • 4,700 SY bituminous paving
  • 360 LF BEBO arch culvert
  • 2,600 CY cast-in-place concrete
  • 415,000 LB reinforcement bars
  • 431,000 LB fabricated structural steel
  • 200 LF steel bearing piles

Project Details

  • Contract Value: $10.2 million

  • Location: Johnstown, PA, Cambria County

  • Capabilities Highlighted: Heavy Civil/Highway